Tuesday, September 17, 2013

Bathroom Remodel: Pics and Costs

We’ve wanted to remodel our bathroom for some time now. Well, actually, all we wanted to do was replace the vanity. When we bought the house, there were some mysterious orange-brown stains on the vanity top. The only thing I can think these are from is an adventure in home hair dying gone awry by the previous owner. It didn’t bother us too much, but it was always on the ever-growing list of things to replace and repair. Other than one coat of white paint and some stick-on vinyl floor tiles, we hadn’t really done any work to the bathroom. Then one day, Evan says let’s take the plunge and do some work on the house. Getting the bathroom re-done seemed like the most feasible project to take on. And of course, why just replace the vanity when you can get a complete, shiny, new bathroom. Millie is still bathed in the kitchen sink and we have a second bathroom with a shower that we could move into while the main one was remodeled. So, off we went.


We hired the same friend who tiled our kitchen floor to retile the bathroom shower, the floor, and the floor to the downstairs bathroom. We also “hired” our dads to help rip out the old vanity and to put the new one in. We retained our same toilet, but got a new seat. We kept our same tub, but replaced the faucet and hardware (just the decorative pieces, we didn’t change the plumbing). We also hired my sister-in-law to paint because we hate painting. The mirror also stayed and the light fixture we replaced a few years ago, so that also stayed.

We took down the shower door and discovered all sorts of disgusting muck underneath it. Then the walls of the shower came down, the vanity was removed, the toilet was uprooted, and the floor ripped out. At one point there was nothing in the bathroom, but the tub. Then, our friend got to do all the hard work.



Once the tile was in, it was our turn to put in the vanity. Naturally, nothing works like it’s supposed to. For whatever reason, the plumbing was not centered on the wall so the vanity drawer was hitting a pipe and wouldn’t close. So we had to cut a notch into the drawer so the vanity would fit. Then it was time to replace the towel bars, heat register, hang a new shower curtain and rod, and put all the pretty things in it. 

 
 
After all was said and done, it took about 10 days and 547,458,669 trips to Lowes to complete and here is the breakdown of the cost.
  • Tile for floor and shower (Floor and Décor): $512.45
  • Tile Pencil Liner/Trim and Soap Dish (Home Depot): $107.53
  • Vanity (Home Depot): $435.76
  • Tile Supplies (Lowes): $187.28
  • Paint (Lowes): $26.97
  • Misc. Supplies (toilet rings, toilet and sink supply lines, liquid nails, paint brushes, etc.): $201.94
  • Decorative Supplies: $175.30
  • Tile Labor: $900.00
  • Paint Labor: $125.00
  • I cashed in some credit card rewards: -$100.00

GRAND TOTAL: $2,572.23




BEFORE




AFTER





 

16 comments:

  1. Wow, it looks really good! You are lucky you didn't find many plumbing problems.

    ReplyDelete
  2. Thanks for updating this nice and relevant information as we are also working with this.

    Prodigg Signatures

    ReplyDelete
  3. Brittney Davis
    Wow these were some big improvements and within a reasonable budget.

    ReplyDelete
  4. You spent just over $2,000? It just proves that you don't need a large amount of money to create an expensive look. I bet you were so thrilled when you finished the remodeling. I am very happy for you and your husband for such an amazing job.

    Chase Conely @ GMRoth.com

    ReplyDelete
  5. Wow, great work! Looks so much better! Not a bad deal, I'm glad it went well =)

    Jim | http://www.dpollackglass.com/products.htm

    ReplyDelete
  6. One of a kind bathroom remodeling under 2 grand and it's really incredible. I hope I read this stuff before I hire a contractor for my bathroom remodel in Los Angeles. But anyway keep up the good work.

    ReplyDelete
  7. Did you run into any plumbing problems when remodeling, such as leaks? I know it is common for people to run into these types of problems.

    ReplyDelete
  8. Last year I decided, after much thought, that I definitely wanted to remodel my bathroom. A colleague of mine suggested I contact the team at Classic Kitchen and Bath in Illinois. I was very pleased after the first call. What I admire the most about their team is that they truly enjoy what they do and they took the time to customize designs to my desire. To date, I stand in my bathroom and look at it with awe. Visit their website today www.myclassickitchenandbath.com or call 630-515-9151. I highly recommend them to everyone considering kitchen and bathroom remodeling.

    ReplyDelete
  9. That's a fantastic price for an almost full bathroom remodel. I'm also curious about any hidden damage or plumbing issues found. We find the number two cause of cost overruns is hidden moisture damage, the number one cause being homeowner scope creep.

    ReplyDelete
  10. Very nice post.
    I like your designs it's very beautiful.
    Thanks! for sharing very informative post.
    Bathroom remodeling Baltimore

    ReplyDelete
  11. heyyy..!!i love your blog...!!you can also visit our website that offer home improvement services

    ReplyDelete
  12. This comment has been removed by the author.

    ReplyDelete
  13. Useful information shared. I am very happy to read this article. Thanks for giving us nice info. Fantastic walk through. I appreciate this post.bathroom remodeling Austin

    ReplyDelete